I was feeling off-colour most of the day yesterday, and even ended up having a 3-hour nanna nap in the afternoon because I felt so exhausted – when I woke up I had a raging sore throat, and sure enough today it has hung around and I managed to add super-sensitive hearing to the mix. After croaking my way through a one-hour meeting at work, my boss has sent me home with my tail between my legs to rest up for the afternoon … and truth be told it didn’t take much convincing, ‘cos I’m feeling ‘not too flash’ on the whole. Everyone at work was driving me crazy noise-wise, so I think it’s very clever that I not stay around any longer or my patience threshold may not survive … yikes!
Last night, though, even though I was feeling crappy I did manage to get a few stitches into a new start – I have about 6-8 Halloween/Autumn projects that I kitted up with the fabrics all cut up, and the threads pulled, so I’ve decided I should continue working my way through those until they’re finished before I move on to something more challenging (and then I can put the threads away again!). Last night I started The Trilogy’s “October Boo” from their Mini Gingham series – I don’t think it’ll take too long to finish this one off, and it was a really nice change from Just Nan and her squillions of colour changes in one small space! This one is designed to be stitched over-one, but I cut my fabric larger and I’m stitching it over-two instead.
I’ve been tossing up whether to join a new challenge in 2011, where you pull 15 new-start projects and stitch on a new one every day for the first 15 days of January, then aim to have them all completed by the year’s end. I love this idea (hey, who wouldn’t love all those new starts? haha), but because I use Q-snaps etc I don’t think this would work for me, because it’d be a right royal pain pulling them apart every night after just doing a few stitches. Instead, I’m thinking of just pulling 15 new-start projects and kitting them up, then sitting them in a separate bag/basket and making them my challenge to be completed during the year … it’s food for thought anyway!
I have to admit I find it so much better when I have projects fully kitted and ready to be picked up – I’m a real procrastinator when it comes to new starts, and I can go for days on end without starting anything just because I hate cutting up the fabrics and pulling all the threads out … having a basket of ‘ready-to-stitch’ projects means I don’t have to think about it, I can just put my hand into the basket, pull out a new project, and just pretty much start stitching straightaway! Of course, I do have to get motivated on at least one day to get the projects kitted up in the first place, but I truly do think it’s doable … in fact, I think I may even start working through my list of projects and find at least 15 projects that I really really want to stitch, and find out if I have all the threads (I’m always getting caught out by starting projects and finding out a thread is missing pffft). In fact, I think that’s a perfect job for this afternoon when I’m vegetating out at home feeling sorry for myself … although just thinking about it has worn me out … so perhaps I should leave the decisions for another day LOL.













